100 kWp Solar PV System

National Archives of Australia – Preservation Facility, Mitchell, ACT, Australia

100 kWp Solar PV System

National Archives of Australia – Preservation Facility, Mitchell, ACT, Australia

Renewable Technology

100 kWp Rooftop Solar

Coming off the back of a successfully executed Solar installation, ASG was asked to engineer, procure and construct the first of multiple stages of this Solar infrastructure project. The Building serves as the Australian Archives that collects & preserves important government records.
This first stage to be constructed was the 100Kwp rooftop installation.

Watch Video

Renewable Technology

100 kWp Rooftop Solar

Coming off the back of a successfully executed Solar installation, ASG was asked to engineer, procure and construct the first of multiple stages of this Solar infrastructure project. The Building serves as the Australian Archives that collects & preserves important government records.
This first stage to be constructed was the 100Kwp rooftop installation.

Watch Video
Preservation Facility
Project Highlight

After a successful ‘defect-free’ commissioning process with Evo Energy & Rudds Engineering, ASG was given the task of progressing with turning the STC system into a Registered Power Plant. Stay tuned for Stage 2.

The Challenge
Preservation Facility
Project Highlight

After a successful ‘defect-free’ commissioning process with Evo Energy & Rudds Engineering, ASG was given the task of progressing with turning the STC system into a Registered Power Plant. Stay tuned for Stage 2.

The Challenge
Project Details
Technical Specs
  • Jinko Solar 380Wp 72 Cell Modules 
  • SMA Tripower Core 1 50-40 inverters
  • Clenergy Non-Penetrating Solar Framing 
  • ASG Build Class 3 Network Protection 
  • SMA EnnexOS Solar Monitoring 
Project Details
Technical Specs
  • Jinko Solar 380Wp 72 Cell Modules 
  • SMA Tripower Core 1 50-40 inverters
  • Clenergy Non-Penetrating Solar Framing
  • ASG Build Class 3 Network Protection 
  • SMA EnnexOS Solar Monitoring
  • The Challenge

    The Scope for the Woolstore was to seamlessly integrate this building infrastructure into the Existing Inner Range Integriti, Genertec & ABB Welcome M intercom systems ensuring no downtime or interruptions to the existing commissioned system.

    The Solution

    ASG took a systematic approach to integrate the new infrastructure in the existing system including working with the incumbent contractors.
    ASG utilised carefully designed & Documented ITPs and MOPs to ensure the commissioning and integration was floorless.