80 kWp Solar PV System

Queanbeyan High School, Queanbeyan, NSW, Australia

80 kWp Solar PV System

Queanbeyan High School, Queanbeyan, NSW, Australia

Renewable Technology

80 kWp Rooftop Solar

ASG completed a High-yielding 80 kWp rooftop PV system for our client in Queanbeyan, NSW.

The project consisted of the design, installation and commission of an 80kWp solar PV system including the installation of 4x SMA 3-phase inverters, 1x AC PV-DB and 1x Class 3 Generator Connection Cubicle.

Watch Video

Renewable Technology

80 kWp Rooftop Solar

ASG completed a High-yielding 80 kWp rooftop PV system for our client in Queanbeyan, NSW.

The project consisted of the design, installation and commission of an 80kWp solar PV system including the installation of 4x SMA 3-phase inverters, 1x AC PV-DB and 1x Class 3 Generator Connection Cubicle.

Watch Video
Queanbeyan, NSW, Australia
Project Highlight

The client will benefit from this installation with a 4-year payback period and by obtaining additional star rating while understanding NABAS assessment.

The Challenge
Queanbeyan, NSW, Australia
Project Highlight

The client will benefit from this installation with a 4-year payback period and by obtaining additional star rating while understanding NABAS assessment.

The Challenge
Project Details
Technical Specs
  • 80 kWp PV Solar System
  • 216 x 370W LONGi Solar PV modules
  • 4 x 24kw SMA Sunny Tripower Inverters
  • 1x Class 3 GCC for Network Protection including comprehensive injection testing
  • Class 3 Generator Connection Cubicle
  • Testing and Commissioning using the Seaward PV200 Tester for comparison of IV curves to STC conditions
Project Details
Technical Specs
  • 80 kWp PV Solar System
  • 216 x 370W LONGi Solar PV modules
  • 4 x 24kw SMA Sunny Tripower Inverters
  • 1x Class 3 GCC for Network Protection including comprehensive injection testing
  • Class 3 Generator Connection Cubicle
  • Testing and Commissioning using the Seaward PV200 Tester for comparison of IV curves to STC conditions
  • The Challenge

    The challenge on this project was the logistics of transporting 5 tones of materials from Australian Smart Group’s warehouse to site and craning the material Onsite the work face while other plant operated within the same area.

    The Solution

    ASG and its WSH consultants QSE Evolution overcame these challenges by incorporating heavy load materials, handling a plan that included offsite and onsite transportation, material handling, engineering and strict working at heights permits.